Forward top fuse install

Total: 1665.8 hours
Top Fuse Skin: 36.3 hours
Top fuse install: 15.7

Top fuse install happened without any significant problems. The top fuse was installed way back in section 31 and stored (see here) then once the panel decisions were made and the sub-panel reinforced for the GTN650 (see here) and the cutouts made for the defrost fans I could do the install. To do the fan cutouts I drilled the attach holes of the fan first, found the center, drilled a pilot hole in the center, clamped a wood block under and used a 3 inch hole drill and went slow, No problem.

 